Welcome to the Picture 51

page of the FSMR website

 

As part of the planned new remodelled signalling system, a train detection system employing wheel flange treadles is being installed throughout the railway. In order to accommodate all the extra new electronics and switch gear, an auxillary signal box has been constructed. This will serve as an unmanned building adjacent to the existing main box, freeing space in the main signal control box for the signal man!! And giving plenty of scope for expansion

(previously, it was all getting a bit cramped!!) 

 

View of two husband and wife FSMR members working on the construction of the auxillary box

 

 

BACK TO THE GALLERY

 

BACK TO MAIN PAGE