These photos were taken during the  October track weekend in  2006 when 5 panels were lifted and replaced on badgers curve in one weekend. At the same time the opportunity was used to install a sleeper retaining wall against the earth bank at this location.

The works train in use over the weekend, having the luxury of steam power in the diesels absence on its heavy repair and overhaul this winter.

  

The first task was to set up a laser level to maintain the gradient profile between the two untouched sections of line. The first section to be lifted is in front of the laser. At the same time, the new sleep wall is being constructed behind

 

 

After lifting cutting off the fish[;ate bolts and lifting the panels out onto the bank, the next step is to use the tractor loader and hand tools!! to remove about 4 inches of the old track ballast The end of this weekends working area can be seen where the track restarts.

 

 

Even my youngest gets in on the act with the shovel!!.

 

 

 

Next, after fitting new sleepers to the old panels, they are put back in place on a  geo-tex membrane to prevent the fresh ballast getting contaminated from below. The fishplates are then fitted with new bolts and greased to ensure trouble free movement (critical to avoid thermal damage in the hot sun!!)

 

 

The scale of the weekends work can be seen here, the new panels starting at the bottom right of the picture through to the top left of the picture. The full size sleepers are ready for the new sleeper retaining wall to be installed at the same time